DARTMOUTH MassDOT plans new crosswalks and better walk signals on Route 6 in Dartmouth between Brandt Avenue and Summit Avenue, and people can weigh in on the design at an online hearing Tuesday, Dec. 1.
The design public hearing starts at 6 p.m., according to the hearing flyer MassDOT posted on its Facebook page. The state's project database lists the Dec. 1 hearing as the project's current step, and its milestone list shows no earlier public hearing.
The work targets state-owned traffic signals near bus stops, and the project record says the upgrades are for vulnerable road users, such as people on foot, at those signals. MassDOT's flyer says the changes will make it safer to cross the street at both locations, which it calls particularly helpful for people who ride the bus, and that a disproportionate number of crashes involving pedestrians have historically happened near bus stops.
The Dartmouth stretch is one of two locations in the project, and the other is North Pearl Street (Route 27) in Brockton, from Reynolds Memorial Highway to the Boston Medical Center south driveway.
What could change on State Road
MassDOT's project page, which we read in full Wednesday, says the work will include some or all of these changes at the two locations:
- new signal timing, phasing, coordination and detection
- new or rebuilt curb ramps and crosswalks
- accessible pedestrian signal push buttons with countdown walk signals
- rebuilt sidewalks that connect the signalized intersections with bus stops
- limits on right turns on red
- minor changes to the shape of the road
The record does not say which of those changes apply to the Dartmouth stretch and which to Brockton. The project is part of a multi-year effort, the record says, and this fiscal 2027 round follows four projects from fiscal 2026. The page says the fiscal 2027 round includes locations that may need right-of-way, environmental permits, more complex design work or more outreach to towns, without saying which.
What it costs
MassDOT estimates the total contract for both locations at about $1.5 million ($1,502,832.73 in the record). The page does not split the cost between Dartmouth and Brockton.
The state's 2027 Transportation Improvement Program carries two federal safety lines for the project totaling about $1.24 million, the record shows. The larger, $1.04 million, is a Highway Safety Improvement Program line, and the smaller, $199,778, is drawn from that program's vulnerable user safety share. By our math from those figures, the federal share in both lines is 90% and the state share 10%.
How we got here and what comes next
MassDOT entered the project Feb. 19, 2026, and its Project Review Committee approved it March 3, according to the milestone list on the project page. A consultant is doing the design, and MassDOT is responsible for any right-of-way. The page lists the 25% and 75% design packages as received June 8 and comments on the 75% package as logged July 13 and 14. Jonathan E. Freeman is listed as the project manager.
How to weigh in
The hearing is virtual, and MassDOT's flyer sends people to the Highway Division's events page on mass.gov to attend. Questions about the project can go by email to MassDOTProjectManagement@dot.state.ma.us, and the flyer says written statements go to Carrie A. Lavallee, chief engineer, MassDOT, 10 Park Plaza, Boston, MA 02116, attention Project Management, citing project file No. 616306, the number on the state's project page.
MassDOT offers translation, interpretation and other accommodations on request through its Highway Project Accommodations office at MassDOTHighwayProjectAccommodations@dot.state.ma.us. The flyer asked for those requests at least 10 business days before the hearing, a window that closed in mid-November, and it names that office as the contact for any accommodation need.
Beyond Tuesday's hearing, the project page shows no contract yet and no date for putting the work out to bid, and it lists construction to begin in the winter of 2027 to 2028.
Label: Reported by us, from the town's posted records.
Notes
Every fact about the project, its cost, funding, locations and milestones comes from MassDOT's project information page for project 616306, which we read in full on Nov. 25. The hearing date and time, the virtual format, the events page, the emails, the accommodations request window and the mailing address for written statements come from the hearing notice and flyer MassDOT posted on its own Facebook page, which we read Nov. 25. We checked each date and weekday against a calendar. We did not ask MassDOT or the town for comment for this preview, since MassDOT presents the design in public at the hearing.
Corrections
No corrections to this story. If something here is wrong, tell us. Every correction is dated on the story and listed in our public log.
Sources (2)
- MassDOT Highway Division project information: project 616306, District 5 VRU crosswalk installation at state signals at multiple locationsProject description, the two locations, design and right-of-way responsibility, construction start, project manager, estimated total contract cost, 2027 TIP funding lines and milestone list; current status "Design Public Hearing (as of 12/01/2026)". Read Nov. 25, 2026.
- MassDOT on Facebook: virtual design public hearing notice and flyer for project 616306Hearing date and time (Tuesday, Dec. 1, 2026, 6 p.m.), virtual format, the mass.gov Highway Division events page, the project inquiries email, the address for written statements, the accommodations office and the flyer's reasons for the work. Read Nov. 25, 2026.